Brickstone

As part of a refresh and rebrand for Brickstone, the resident hallways, amenity and office spaces of this three-story, 53-unit apartment building were fully renovated. The club room was reconfigured to include a large kitchen island and linear fireplace, the leasing lounge space was increased, the second floor fitness center was upgraded, and the third […]

Read More

Linwood Elementary School – Building Renovations

Demolition & reconstruction of center wing of school (secure vestibule, main office suite, and special education spaces) phased over 2 summers and 1 school year, as well as renovation of existing classrooms, offices, restrooms, hallways, and mechanical rooms.

Read More

TGK Automotive Specialists – Maplewood Addition

TGK Maplewood received a 2,000 square feet addition that included 2 repair/service bays. This addition required a higher roof than the existing due to the working clearance of hoist equipment that is be used. Additionally, they received renovations to the existing interior space that also included a new accessible restroom for customers and staff.  The […]

Read More

TGK Automotive Specialists – Hugo Addition

TGK Automotive desired an expanded vehicle repair shop. The project consisted of a nearly 3,000 sf precast concrete and steel bar joist building addition, which matched the existing building design and construction. Other aspects of the project included: an increased number of vehicle hoist bays from eight to twelve; a raised, interior platform for relocation […]

Read More

Merchants Bank

As First National Bank Northfield merged with Merchants Bank, a facelift and rebrand was in order. The Northfield history and traditional bones of the historic building needed to be respected while updating the interior to support current and future banking processes. The beautiful existing stone-clad columns and traditional wood millwork was retained, while adding customer […]

Read More

Tylia Apartments

As part of a refresh and rebrand from Basswood Trails Apartments to Tylia, the amenity and office spaces of this two-building apartment complex were fully renovated. Entry lobbies were reconfigured to create open and welcoming entry and mail areas, an underutilized fitness room was converted into new office space entered from the lobby, exterior windows […]

Read More

Thermo King West Office Remodel

The project consisted of a major interior renovation on three levels of the west side office areas within the existing Thermo King corporate headquarters building.  In addition to the new office interior design, the project included an expanded mechanical penthouse for new HVAC equipment with updated HVAC distribution, snow drift houses and structural reinforcement of […]

Read More

Hand In Hand Christian Montessori School

The original building, built in 1936 as a neighborhood school, had several additions and been modified significantly to be used an Armory by the US Army Reserves.  The school serves infants through high school students, so the various wings were designed to create a progression through the building as students grow in the program.  Program […]

Read More

Riverdale Church

The interior remodel of Riverdale Church involved a conversion of a daycare into ministry children areas and classrooms, new offices, a new coffee café with seating and small break-out areas, remodel of the entire entrance lobby and sanctuary entry. The gym was also reconfigured and reduced in size to accommodate additional classrooms and performance spaces.

Read More
Older Posts