Thermo King West Office Remodel

The project consisted of a major interior renovation on three levels of the west side office areas within the existing Thermo King corporate headquarters building.  In addition to the new office interior design, the project included an expanded mechanical penthouse for new HVAC equipment with updated HVAC distribution, snow drift houses and structural reinforcement of […]

Read More

Yeshiva of Minneapolis

The remodeling included connecting onto an existing three-story synagogue with a three-story dormitory, new regulation sized gymnasium, restrooms, locker rooms, classrooms, offices, elevator, recreational and social areas, and a new two-story glass main entrance that tied the two facilities together. The team also dealt with stormwater management issues, building setback issues, high water table issue, […]

Read More

Rahr Malting Co. Tech Center

Pilot brewery and tech lab designed to boost product testing capabilities. The facility consists of a brewhouse, tasting rooms, brewery and barley labs, pilot malt areas, conference rooms, tech labs, and QA/QC labs.

Read More

Tylia Apartments

As part of a refresh and rebrand from Basswood Trails Apartments to Tylia, the amenity and office spaces of this two-building apartment complex were fully renovated. Entry lobbies were reconfigured to create open and welcoming entry and mail areas, an underutilized fitness room was converted into new office space entered from the lobby, exterior windows […]

Read More

Brickstone

As part of a refresh and rebrand for Brickstone, the resident hallways, amenity and office spaces of this three-story, 53-unit apartment building were fully renovated. The club room was reconfigured to include a large kitchen island and linear fireplace, the leasing lounge space was increased, the second floor fitness center was upgraded, and the third […]

Read More

Linwood Elementary School – Building Renovations

Demolition & reconstruction of center wing of school (secure vestibule, main office suite, and special education spaces) phased over 2 summers and 1 school year, as well as renovation of existing classrooms, offices, restrooms, hallways, and mechanical rooms.

Read More

TGK Automotive Specialists – Hugo Addition

TGK Automotive desired an expanded vehicle repair shop. The project consisted of a nearly 3,000 sf precast concrete and steel bar joist building addition, which matched the existing building design and construction. Other aspects of the project included: an increased number of vehicle hoist bays from eight to twelve; a raised, interior platform for relocation […]

Read More

St. Louis Park City Hall

The St. Louis Park City Hall completed a substantial renovation to the first floor of their 50 year-old building with the help of Krech, O’Brien, Mueller and Associates. With an emphasis on sustainability, the multi-faceted project included a new stone entrance canopy, an open lobby and reception area, stairwell improvements, private meeting spaces, public restrooms, […]

Read More

Int’l Union of Operating Engineers

Local 49 represents operating engineers who work as heavy-equipment operators, mechanics and surveyors. They provide instruction at their training facility for hazardous material handling procedures, paving applications, crane operation, excavation, forklift operation and heavy-duty highway-equipment operation. This 65,000-square-foot facility contains state-of-the-art training classrooms, eight large shop bays, a welding shop, two wash bays and a […]

Read More
Older Posts