TGK Automotive desired an expanded vehicle repair shop. The project consisted of a nearly 3,000 sf precast concrete and steel bar joist building addition, which matched the existing building design and construction. Other aspects of the project included: an increased number of vehicle hoist bays from eight to twelve; a raised, interior platform for relocation of various pieces of equipment; and expanded parking areas on the site. These components allowed TGK’s operation much needed additional space to accommodate the needs of their growing business in Hugo, MN.